Backing up and restoring a Power Operation system
A Power Operation system can be backed up and then restored if the original Power Operation system is no longer available.
The procedures outlined in this document describe how to back up and restore standalone and redundant Power Operation systems, and include Power Monitoring Expert (Advanced Reporting and Dashboards).
NOTE: This procedure does not support distributed PME systems.
The Power Operation system components and modules you will need to back up will vary, depending on your system architecture and whether your system is redundant.
NOTE: When backing up and restoring a project, confirm that "Include Subdirectories" is checked so that your graphics and advanced one-line configuration is included.