Using the method ChangeCoordinateSystem2, the change of the coordinate system can be prolonged to a certain end position on the connected path.
In the example, the synchronization phase is executed with segment 10. The synchronization phase begins 15 mm after the segment start and is finished 25 mm before the segment end.