About the Book
The purpose of this document is to help you to configure your Modicon M218 Logic Controller.
NOTE: Read and understand this document and all related documents before installing, operating, or maintaining your Modicon M218 Logic Controller.
The Modicon M218 Logic Controller users should read through the entire document to understand all features.
This document has been updated with the release of EcoStruxureTM Machine Expert V1.1.
Title of Documentation |
Reference Number |
---|---|
EcoStruxure Machine Expert Programming Guide |
EIO0000002854(eng) EIO0000002859 (chs) |
Modicon M218 Logic Controller Hardware Guide |
EIO0000003616 (eng) EIO0000003617 (chs) |
Modicon TM2...N Expansion Modules Programming Guide |
EIO0000003784 (eng) EIO0000003785 (chs) |
Modicon TM2 Modules Configuration Programming Guide |
EIO0000003432 (eng) EIO0000003437 (chs) |
Modicon TM3 Modules Configuration Programming Guide |
EIO0000003119 (eng) EIO0000003124 (chs) |
Modicon M218 Logic Controller System Functions and Variables M218 PLCSystem Library Guide |
EIO0000003620 (eng) EIO0000003621 (chs) |
Modicon M218 Logic Controller High Speed Counting M218 HSC Library Guide |
EIO0000003618 (eng) EIO0000003619 (chs) |
Modicon M218 Logic Controller Pulse Train Output, Pulse Width Modulation M218 PTOPWM Library Guide |
EIO0000003729 (eng) EIO0000003730 (chs) |
Modicon M218 Logic Controller Packaging Library M218 Packaging Library Guide |
EIO0000003731 (eng) EIO0000003732 (chs) |
You can download these technical publications and other technical information from our website at https://www.schneider-electric.com/en/download
|
LOSS OF CONTROL |
oThe designer of any control scheme must consider the potential failure modes of control paths and, for certain critical control functions, provide a means to achieve a safe state during and after a path failure. Examples of critical control functions are emergency stop and overtravel stop, power outage and restart. oSeparate or redundant control paths must be provided for critical control functions. oSystem control paths may include communication links. Consideration must be given to the implications of unanticipated transmission delays or failures of the link. oObserve all accident prevention regulations and local safety guidelines.1 oEach implementation of this equipment must be individually and thoroughly tested for proper operation before being placed into service. |
Failure to follow these instructions can result in death, serious injury, or equipment damage. |
1 For additional information, refer to NEMA ICS 1.1 (latest edition), "Safety Guidelines for the Application, Installation, and Maintenance of Solid State Control" and to NEMA ICS 7.1 (latest edition), "Safety Standards for Construction and Guide for Selection, Installation and Operation of Adjustable-Speed Drive Systems" or their equivalent governing your particular location.
|
UNINTENDED EQUIPMENT OPERATION |
oOnly use software approved by Schneider Electric for use with this equipment. oUpdate your application program every time you change the physical hardware configuration. |
Failure to follow these instructions can result in death, serious injury, or equipment damage. |