The following procedures describe the replacement of the slide films at the telescopic axis as an example. The steps for the Telescopic Axis Double are similar. Note the two lower tubes when handling the Telescopic Axis Double.
Perform the following procedures to replace the slide films:
Removing the telescopic axis (refer to Replacing the Telescopic Axis)
Step |
Action |
---|---|
1 |
Remove both mounting screws (2) at the upper universal joint (1) in order to be able to separate the upper tube (6) and the universal joints. ![]() |
2 |
Remove the upper universal joint. |
3 |
Remove the clamping on the three lower tubes (8) of the closure bridge (4) and release the self-blocking of the clamping sets by slightly tapping on the three clamping bolts (3). |
4 |
Remove the closure bridge from the tubes. |
5 |
Pull off the upper tube and the slide bridge (7) from the three outer tubes. |
NOTICE | |
---|---|
Step |
Action |
---|---|
1 |
Remove all four slide films (5) from the bearing points of the bridges and clean the bearing points if necessary. ![]() |
2 |
Insert the new slide films into the bearings. Ensure that the index lugs located on the films engage correctly in the corresponding recesses of the bearing points. |
3 |
Verify that the slide films are fully inserted into the bearing bores. |
4 |
Assemble the telescopic axis in reverse order and ensure that the universal joints are orientated correctly in relation to one another. The locating pin in the lower universal joint is in alignment with the larger screw (2) of the upper universal joint or also the larger bore of the upper tube (6). For further information about the necessary torques, refer to Telescopic Axis. |
5 |
Mount the telescopic axis and calibrate it depending on the necessary angle precision of the application. For further information, refer to Replacing the Telescopic Axis and Calibrating the Robot Mechanics. |