Before the signals can be exchanged via the C2C network, the synchronization has to be established.
For this reason, a Sercos phase run-up is performed:
After the C2C Slave project and C2C Master project were created the phase run-up of Sercos to the communication phase 4 must be performed on both systems.
After the communication phase 4 has been reached in C2C Master and C2C Slave, the slave automatically starts synchronizing the sub-network to the superordinated network.
If this is executed successfully, then the parameter SyncState of the C2C Slave is set to Synchronized / 5.
When all the connected C2C Slave are in state Synchronized / 5, then the parameter SyncGroupState of the C2C Master is set to C2C network Synchronized / 5.