Mechanical Mounting

Procedure

Step

Action

1

Screw the pan-head screws M6 (socket head cap screws) into the prepared mounting holes.

2

Keep a distance of 10 mm (0.39 in) between the screw head and the mounting plate.

3

Hook in device and verify the vertical mounting arrangement.

4

Tighten the mounting screws (torque: 4.6 Nm (41 lbf in)).