The view opens on the right-hand side when you select an axis (time or Y axis) in the tree view.
The parameters displayed depend on the axis that is selected:
|
Parameter |
Description |
|---|---|
|
|
Select the following scaling options:
|
|
|
When the is selected, enter a start value for the axis. It can be a literal, variable (integer data type), or constant variable (integer data type). |
|
|
When the is selected, enter an end value for the axis. |
|
|
Only available for a time axis when the is selected. Enter a value to define a constant length for the axis. The start value is adapted accordingly. |
|
|
Select the option to create a diagram with grid lines in x- or y-direction. Select the color of the grid lines from the list next to the parameter. |
|
|
Only available for Y axis. Select the option and enter a describing text in the box that will be displayed in the upper left corner of the diagram. |
|
section |
|
|
|
If the option is selected, EcoStruxure Machine Expert draws tick marks with and . |
|
|
Enter a value to define the distance between the tick marks. |
|
|
Enter a value to define the number of subdivisions between two tick marks. |
The following elements are available:
|
Element |
Description |
|---|---|
|
button |
Click the button to open the dialog box and configure the font for the selected axis. |
|
button |
Click the button to reset the settings to the default values. |
|
button |
Click the button to save the settings as default values. |
|
link |
Click the link to see a preview of the diagram you defined in the view. |
If a trace is selected in the tree view, the following elements are available:
|
Element |
Description |
|---|---|
|
link |
Click the link to add a new trace variable to the tree view. |
|
link |
Click the link to delete the selected trace variable from the tree view. |
The preview of the diagram you defined in the view is displayed when you click the link in the view.
Underneath the preview of the diagram, the following elements are available:
|
Element |
Description |
|---|---|
|
parameter |
Select a color for the background of the diagram from the list next to the parameter. |
|
parameter |
Select a color for the background of the selected diagram from the list next to the parameter. |
|
link |
If a diagram is selected, click the link to add a new diagram to the view. |
|
link |
If a diagram is selected, click the link to delete the selected diagram from the view. |
|
link |
Click the link to reset the display settings of the selected diagram or the selected y-axis to the default values. |
|
button |
Click the button to confirm the configuration settings and to save the trace configuration. |