Initial Start-Up
What Is in This Section?
This section contains the following topics:
oAllocation of the Sercos Addresses
oParametrization of the Robot Mechanics
oMounting the Lower Arms with Parallel Plate
oMounting the Rods for the Parallel Linkage
oSetting the Monitoring
oVerifying the Installation
oStart-Up